What's in this section
Water Management Plans - Why?
Muskoka River Watershed
Water Levels Throughout the Year
Operating Regime & Daily Procedures
Checking Water Levels on Your Lake
Contact Information and Links

 


Water Management Plans - Why?

The goal of water management planning is to contribute to the environmental, social and economic well being of the people of Ontario through the sustainable development of waterpower resources and to manage these resources in an ecologically sustainable way for the benefit of present and future generations.

Local waterpower companies (Ontario Power Generation, Orillia Power Generation Corporation, Algonquin Power Fund Inc. and Bracebridge Generation Ltd) worked with the Ministry of Natural Resources to develop a water management plan for the Muskoka River watershed. The Muskoka River Water Management Plan (MRWMP), which was implemented in 2006, takes an ecosystem-based approach to water management by considering the interests and concerns of all water users within the watershed (e.g. fish, wildlife, navigation, hydro generation, recreation, flood control etc.).

The Muskoka River Water Management Plan includes:

  • Operational plans for each waterpower facility or water control structure (dam)
  • Legally enforceable provisions for the management of flows and water levels
  • Compliance monitoring to ensure that waterpower industry facilities are meeting the requirements of the plan
  • Effectiveness monitoring program to determine whether the implementation of the plan results in the anticipated ecological and social improvements.

MRWMP - Cover & Table of Contents

1 Plan Approval
2 Introduction
3 Physical and Biological Environment
4 Social and Economic Environment
Figure 4.1 - Land Tenure and Major Infrastructure
Figure 4.2 - Recreation and Tourism
5 Water Control Structures and Water Power Facilities
6 Issues, Resource Vaues and Interests
7 Initial Data Gaps and Deficiencies
8 Baseline Data Collection
9 Option Development Process
10 Evaluation Criteria
11 Preferred Strategy and Comparison with Current Operation
12 Operating Plans
13 Compliance Monitoring Plan
14 Effectiveness Monitoring Program
15 Data Gaps, Science and Information Needs
16 Plan Implementation
17 Plan Term, Amendments, Review and Renewal
References and Reference Information
Addendum for Background Information Report

Appendices - Cover & Table of Contents
A   Memberships of Steering Committee, Planning Committee and Public Advisory Committee
B   Terms of Reference for Muskoka River Water Management Plan
C   Summary of Existing Operating Plans for Water Power Facilities and Water Control Structures
D   Public Consultation Record
E   First Nations Consultation
F   Option Development Process - ARSP Modeling and Analysis of Lake Levels and River Flows
Big Eddy Generating Station
Birds Mill Dam
Bracebridge Generating Station
Buck Lake
Burgess Generating Station
Burnt Island Lake
Camp Lake
Canoe, Smoke, Tea Lakes
Fox Lake
Hanna Chute Generating Station
High Falls Generating Station
Huntsville Lake
Joe Lake
Kawagama Lake
Lake of Bays
Mary Lake
Matthias Generating Station
McCraney Lake
Lake Muskoka
Ragged Lake
Ragged Rapids Generating Station
Rosseau & Joseph Lakes
South Falls Generating Station
Tasso Lake
Trethewey Generating Station
Wilson Generating Station
Wood Lake
G   Waterpower Facility Monitoring Locations
       


Terms of Use | ©2004 District Municipality of Muskoka

Developed By
District Municipality of Muskoka logo FedNor logo